Skip to content

Bend it, shape it, any way you want it

The process of estimating, detailing and fabricating steel to meet exact project specifications requires a high degree of knowledge, skill and experience. At CMC, we understand the complexity of transforming steel for construction applications and other industrial products — and we’ve been doing it for more than 60 years.

CMC operates state-of-the-art fabrication facilities in more than 60 locations across North America that are supported through our rebar-producing mills across the country, allowing us to serve our customers reliably year-round. Our facilities offer rebar, rebar accessories, fence posts, wire mesh, construction products and more. With almost 2.5 million tons of annual fabricating capacity, we have the ability to meet your fabrication needs with on-time delivery wherever your project is located. We’re committed to understanding your needs, developing custom solutions and delivering quality products for projects large and small.

 


 

PRODUCTS

Statistics

WE'VE BEEN TRANSFORMING STEEL

FOR CONSTRUCTION PROJECTS FOR MORE THAN

60

YEARS

WE HAVE NEARLY

2.5

MILLION TONS

OF FABRICATION CAPACITY

OUR PEOPLE MAKE IT POSSIBLE

T. Boone Pickens Cancer Hospital in Dallas, TX

T. Boone Pickens Cancer Hospital Dallas, TX

$62.8

MILLION

CONSTRUCTION COST

175,000

SQ FT

FIRST

DEDICATED

CANCER FACILITY
IN NORTH TEXAS

Margaret McDermott Bridge IN DALLAS, TX

Margaret McDermott Bridge DALLAS, TX

$115

MILLION

CONSTUCTION COST

285

FEET

ABOVE BRIDGE DECK

10

MILLION

POUNDS OF CONCRETE
IN EACH ABUTMENT

Perot Museum of Nature and Science IN Dallas, TX

Perot Museum of Nature and Science Dallas, TX

$96

MILLION

EST. CONSTRUCTION COST

2,800

TONS

OF CMC REBAR

George W. Bush Presidential Center IN Dallas, TX

George W. Bush Presidential Center Dallas, TX

$250

MILLION

CONSTRUCTION COST

3,200

TONS

OF CMC REBAR

DFW Connector IN Irving, TX

DFW Connector Irving, TX

$1.02

BILLION

CONSTRUCTION COST

43,000

TONS

OF CMC REBAR

Klyde Warren Park IN Dallas, TX

Klyde Warren Park Dallas, TX

3

BLOCKS

ATOP RECESSED FREEWAY

$100

MILLION

CONSTRUCTION COST

64,214

GALLONS

STORMWATER DRAINAGE
SAVED ANNUALLY

Museum Tower Residences IN  Dallas, TX

Museum Tower Residences Dallas, TX

$200

MILLION

CONSTRUCTION COST

4,400

TONS

OF CMC REBAR

The Pentagon (Post 9/11 Rebuild) IN Washington, DC

The Pentagon (Post 9/11 Rebuild) Washington, DC

$700

MILLION

CONSTRUCTION COST

4,000

TONS

OF CMC REBAR

Presidio Parkway/Doyle Drive Upgrade IN San Francisco, CA

Presidio Parkway/Doyle Drive Upgrade San Francisco, CA

$1.4

BILLION

CONSTRUCTION COST

21,000

TONS

OF CMC REBAR

Apple Campus IN Cupertino, CA

Apple Campus Cupertino, CA

$5

BILLION

EST. CONSTRUCTION COST

5,000

TONS

OF CMC REBAR

Clean Rivers Project IN Washington, DC

Clean Rivers Project Washington, DC

$2.7

BILLION

EST. CONSTRUCTION COST

27,000

TONS

OF CMC REBAR

18 MILES OF TUNNEL

100

FEET

BELOW GROUND

Estates at Acqualina IN Sunny Isles Beach, FL

Estates at Acqualina Sunny Isles Beach, FL

$600

MILLION

EST. CONSTRUCTION COST

18,000

TONS

OF CMC REBAR

Ke Kilohana Ward Village IN Honolulu, HI

Ke Kilohana Ward Village Honolulu, HI

2,983

TONS

OF CMC REBAR

Four Seasons Hotel IN Miami, FL

Four Seasons Hotel Miami, FL

$385

MILLION

CONSTRUCTION COST

17,000

TONS

OF CMC REBAR

FABRICATION LOCATIONS

close right chevron right chevron left chevron play Commercial Metals Company